← Back to all case studies

Arts & Crafts

Ten Suppliers, One Assembly Line, 10% Lower Unit Cost

Client
Amazon FBA seller, USA
Channel
Amazon FBA
Product
DIY Craft Kit (10+ components per set)
Volume
5,000 sets/yr
Case study cover for DIY craft kits with cost reduction and quality results

-10%

total unit cost

~0

new QC reviews in 2 yrs

Lower

return rate

10+

suppliers consolidated

The problem

The client bought the main component from one factory and had every other component shipped there for assembly. That created repacking fees on every component, no effective incoming QC at the assembly factory, and frequent missing parts that turned into negative reviews - while the client personally managed more than ten suppliers.

What we did

We took over coordination of all 10+ component suppliers, replaced the ones that could not hold tolerance or delivery, and consolidated every component at our own warehouse for assembly and final QC before packing.

The result

Metric Before After
Total unit cost Baseline -10%
Quality-related negative reviews Frequent missing parts Almost zero new in 2 years
Return rate Elevated Dropped significantly
Supplier coordination 10+ suppliers, client-managed Single point of contact
Assembly and QC At main factory, no incoming QC Consolidated warehouse with incoming QC

Client identity and ASINs are anonymized. No client or supplier names are disclosed. Where a figure did not change, it is shown unchanged.

Sourcing a similar product?

First-order AQL 2.5 inspection included in every quote.